Videos and photographs of the Inch Cape project including activity at our construction sites, work with our supply chain and our involvement with the community, local schools and colleges.
Videos
Click on the image to play the video.
Photographs
Offshore construction
Platform (September 2024)
Nameplate installed
Lower jacket progress
Jacket foundation with pin pile sleeves and mud mat
220kV containers (August 2024)
Intermediate platform (August 2024)
One of two AC transformers arrive in the UK (July 2024)
Transformers arrive at Wallsend (July 2024)
Aerial of Smulders yard (July 2024)
Fourth and final substation jacket roll-up (June 2024)
Roll-up three of substation jacket (June 2024)
Ongoing work on topside (June 2024)
Second wall in place (May 2024)
Scaffolding erected around topside (May 2024)
First roll-up of substation jacket foundation (May 2024)
Auxillary and earthing transformer passes its factory acceptance test (April 2024)
Upper platform deck now in place over lower deck (April 2024)
First coat of paint on jacket section
Aerial of the jacket foundation
J-tubes
Deck bracing in place (March 24)
Factory acceptance test for first offshore transformer
Sections of the jacket foundation (Feb 24)
Welding works
Onshore construction
Aerial looking north (September 2024)
Erecting visual screen
Installing roof sheeting (September 2024)
Site progress aerial (August 2024)
Hand finishing concrete works
Cockenzie site (August 2024)
Aerial of Cockenzie site (July 2024)
Combined building (July 2024)
Site inspection
SVC building (July 2024)
Secondary steelwork
Creating concrete floor slab
Static var compensator building framework (June 2024)
Steel work underway (June 2024)
Progress on steel framework (June 2024)
Aerial of substation site (June 2024)
Installation of secondary steel (June 2024)
Power float at work on the transformer base (June 2024)
Structure for static var compensators building erected (May 2024)
Steel fixing (May 2024)
Super Grid Transformer base (May 2024)
Aerial of whole site (April 2024)
Concrete works (April 2024)
Brogan Hay on reception at the site
Aerial showing transformer bases (March 24)
Working on pad footings for the Combined Building
Inch Cape team on-site
Electic vehicle charger at the Cockenzie site
Computer-generated image of substation
Landfall site before work start
Inch Cape Construction Fund
Prestonpans Plants for Heritage
Cockenzie and Port Seton Children's Gala
Equipment for Preston Lodge Learning Foundation (Duke of Edinburgh Awards)
Longniddry Gala 2024
New gear provided for Tranent and Preston Cricket Club
Music at Hawlawhill Daycare Centre
Cockenzie and Port Seton Community Council flagpoles
Preston Lodge Pipe Band
Retrain Scotland
Working with young people
Primary Engineer winner Libby receives her award (May 2024)
Winning entry the 'Bench Bed' (May 2024)
Judging day for Primary Engineer (April 2024)
Launching Primary Engineer to 200 students at Cockenzie Primary
Inch Cape working with Siemens Energy to deliver Primary Engineer
Presenting pathways into offshore wind at Preston Lodge
STEM multi-school event sponsored by Inch Cape
Hands-on experience in Dundee
Providing careers advice at Preston Lodge